{"id":6099,"date":"2026-06-10T21:26:24","date_gmt":"2026-06-10T21:26:24","guid":{"rendered":"https:\/\/acgp.gov.gn\/?post_type=projets&#038;p=6099"},"modified":"2026-06-10T21:26:24","modified_gmt":"2026-06-10T21:26:24","slug":"travaux-de-construction-et-de-bitumage-dune-autoroute-de-12075-km-en-2x2-voies-a-kankan","status":"publish","type":"projets","link":"https:\/\/acgp.gov.gn\/en\/projets\/construction-and-paving-work-on-a-12075-km-2x2-lane-highway-in-kankan\/","title":{"rendered":"Travaux de construction et de bitumage d\u2019une autoroute de 12,075 km en 2&#215;2 voies \u00e0 Kankan"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>The project to construct and pave the highway in Kankan consists of developing a 2x2 lane highway over a length of 12km, which aims to open up the city and improve interregional traffic flow.<\/p>","protected":false},"author":3,"featured_media":6125,"menu_order":0,"template":"","format":"standard","meta":{"_jf_save_progress":"","_jf_schedule_form":"","_jf_limit_responses":"","type_projet":"eco_projet","statut_projets":"en_cours","description_projet":"","budget_projet":"","est_phare_projet":"false","classement_projet":"0","gallerie_projet":["https:\/\/acgp.gov.gn\/wp-content\/uploads\/2026\/06\/13WhatsApp-Image-2026-06-10-at-18.04.54.jpeg","https:\/\/acgp.gov.gn\/wp-content\/uploads\/2026\/06\/0aa958b7-3c1f-436d-aa9d-593877b04580.jpg","https:\/\/acgp.gov.gn\/wp-content\/uploads\/2026\/06\/6WhatsApp-Image-2026-06-10-at-18.04.45.jpeg","https:\/\/acgp.gov.gn\/wp-content\/uploads\/2026\/06\/IMG_2117.jpg"],"apercu_projet":"<h4 style=\"text-align: center\"><strong>Aper\u00e7u G\u00e9n\u00e9ral<\/strong><\/h4>\n<p>Le projet de construction et de bitumage de l\u2019autoroute \u00e0 Kankan consiste en l\u2019am\u00e9nagement d\u2019une autoroute en 2X2 voies sur une longueur de 12km, qui vise \u00e0 d\u00e9senclaver la ville et fluidifier le trafic interr\u00e9gional.<\/p>\n<p>Inscrit \u00e9galement dans le programme Simandou 2040, ce projet rec\u00e8le une port\u00e9e imminente dans le r\u00e9seau routier national et permettra une interconnexion essentielle \u00e0 la mobilit\u00e9 des personnes et des biens au niveau de la r\u00e9gion.<\/p>\n<p>Les acteurs suivants interviennent sur ce projet\u00a0:<\/p>\n<p>* Maitre d\u2019ouvrage : Minist\u00e8re des Infrastructures et des Travaux Publics (MITP) ;<br \/>\n* Maitre d\u2019ouvrage d\u00e9l\u00e9gu\u00e9 : AGEROUTE ;<br \/>\n* Maitre d\u2019\u0153uvre Public : Administration et Contr\u00f4le des Grands Projets (ACGP) ;<br \/>\n* Entreprise : HENAN CHINE GUINEE ; Contr\u00f4le et supervision des travaux : \u00c9quipe projet ACGP, AGEROUTE<\/p>\n<p>&nbsp;<\/p>\n<h4 style=\"text-align: center\"><strong>Objectifs<\/strong><\/h4>\n<p>*La construction d'une autoroute 2x2 \u00e0 Kankan et structurer l\u2019\u00e9conomie locale et regionale.<\/p>\n<p>&nbsp;<\/p>\n<h4 style=\"text-align: center\"><strong>Composantes Principales<\/strong><\/h4>\n<p>-Travaux pr\u00e9paratoire, corps de la chauss\u00e9e, assainissement et drainage, am\u00e9nagement des carrefours, ouvrage d'art.<\/p>\n<p>&nbsp;<\/p>\n<h4 style=\"text-align: center\"><strong>Impact \u00e9conomique et social<\/strong><\/h4>\n<p>- R\u00e9duction des co\u00fbts et des temps de transports ;<br \/>\n- D\u00e9senclavement et acc\u00e8s aux march\u00e9s ;<br \/>\n- Cr\u00e9ation d'emplois ;<br \/>\n- Acc\u00e8s facile aux services essentiels ;<br \/>\n- S\u00e9curit\u00e9 routi\u00e8re.<\/p>\n","footnotes":""},"class_list":["post-6099","projets","type-projets","status-publish","format-standard","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/projets\/6099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/projets"}],"about":[{"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/types\/projets"}],"author":[{"embeddable":true,"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/users\/3"}],"version-history":[{"count":8,"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/projets\/6099\/revisions"}],"predecessor-version":[{"id":6142,"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/projets\/6099\/revisions\/6142"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/media\/6125"}],"wp:attachment":[{"href":"https:\/\/acgp.gov.gn\/en\/wp-json\/wp\/v2\/media?parent=6099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}